“I like Business Center - HCE because it’s geared to the construction contractor and can import various file formats we receive from owners and engineers,” Weiler says. To create the 3D digital site plan, CE Contracting used Business Center – HCE data preparation and takeoff software from Trimble. “Local sourcing helped us stay on deadline.” “We were able to obtain low plastic replacement soil from a nearby property and supplement the quantity shortfall with crushed stone from a local quarry,” says Weiler. of high plastic clay that needed to be remediated for the structural site. “I wouldn’t want to consider doing it without the technology.”Īnother challenge CE Contracting faced was the soil condition. “It would have been significantly more time consuming to create the entrance and grade the descent without the benefit of machine grade control,” states Weiler. The elevation drop that the road needed to descend to the parking had to be finessed in a way that respected the adjacent property. The entry drive is narrow and splits two adjoining pieces of property. The Bloomsdale site sits on a natural hillside, with the structure and parking lot sitting below the street entrance. “We knew from the start that we’d be using Trimble for machine control, site positioning needs and for creating a 3D site plan.” A Combination of Software and SystemsĪlthough the Bloomsdale Women’s Health and Primary Care Center site was small compared to most of CE Contracting’s projects, there were challenges. “We had to complete the site prep quickly and accurately since so many contractors were waiting for us,” says Derek Drury, president of CE Contracting. CE Contracting knew it would have to be efficient to complete everything on spec and on time. The new health care facility was on a fast-track schedule, with the ribbon cutting set for 11 months after the start date. long coming into the site, and then the concrete paving around the building footprint.” of concrete paving, which includes an offsite street of about 1,000 ft. ![]() “We were also responsible for utilities, which were water lines, sanitary sewer lines, storm sewer lines and catch basins, and pipe to the ditch area. “The site work included excavation, cut and fill and compaction,” says Ben Weiler, PE and vice president, CE Contracting. The small site was formerly open-field farmland and is located on the east side of Interstate 55 at Highway Y, just off the I-55 exit. Genevieve, MO.ĬE Contracting was responsible for site prep on the 3-acre site, as well as utility and concrete work. Louis-based McGrath & Associates was the general contractor responsible for juggling the efforts of approximately 30 subcontractors, including CE Contracting, Inc., Ste. ![]() Genevieve County Memorial Hospital’s new Bloomsdale Women’s Health and Primary Care Center in Bloomsdale, MO, has been a dramatic addition to women’s diagnostic and health care services for the region.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |